PROJECT TIMELINE

Each project is different and subject to different hold-ups. Most projects take anywhere from 12 to 27 months to complete. But below is the general timeline our new construction homes follow.

Project Start

The initial consultation is complete & the project is in full swing.

Phase 1: Pre-construction (5 months)

During this phase, we finalize architectural plans, secure permits, and select materials to ensure every detail is thoughtfully planned before construction begins.

Phase 2: Excavation & Foundation (2 months)

The site is prepared and the foundation is poured, establishing a solid, precise base for your home’s structure.

Phase 3: Framing (4 months)

The home begins to take shape as framing crews build the structural skeleton, defining each space with accuracy and craftsmanship.

Phase 4: Rough-in / MEP (2 months)

Mechanical, electrical, and plumbing systems are expertly installed, integrating the essential infrastructure that brings your home to life.

Phase 5: Exterior Work, Installation & Drywall (3 months)

Exterior finishes are applied and interior walls are enclosed, giving form and function to both the home’s façade and interior spaces.

Phase 6: Finishing Work (8 months)

Custom details, millwork, fixtures, and finishes are installed with care, transforming the structure into a refined and livable home.

Phase 7: Landscaping (3 months)

The final touches are completed outdoors, with thoughtfully designed landscaping that enhances curb appeal and complements the home’s architecture.

Move-in Day

You’ll take a guided walkthrough the project and we’ll work together to identify any items that need attention prior to move-in. We will do a final review meeting with you to answer any operational questions regarding appliances, heating and cooling systems and any other questions. We will do a final clean up to the highest standards possible both within the project and anything on the property that we touched.